Previous load ratings were estimated for a bridge that had “no plans on record”. At that time, the State rated the sufficiency rating of the bridge at 55.6 out of 100.
After obtaining the bridge plans from the City, the State was able to review actual construction documents and has rated the bridge’s sufficiency rating at 7 out of 100.
Does this feel safe to you? The City continues to ignore requests to perform a structural study that calculates projected new traffic impacts.
